Fully automatic system for the high-pressure gas cylinders hydraulic testing that can be inserted in a production line but can also be inserted in a line for re-testing of cylinders.
On the line, cylinders of dimensions can be tested:
The operations performed are:
The system is equipped with a hydraulic unit with pressure multipliers.
The cylinder is picked up at the inlet by the manipulator and loaded in a free station of the 6 present in the hydraulic test.
Each station is independent and has its own pressure transducer and manometer. The pressure test takes place at a pressure up to 500 Bar.
The sealing system is screwless. The holding time under pressure is adjustable via the touchscreen panel on the machine of the testing line.
With the high-pressure gas cylinders hydraulic testing machine, if the cylinder does not pass the test it is declared rejected by the system and automatically discharged in a predetermined position.
At the end of the testing cycle, the cylinder is still full of water and must be emptied and dried. GOMG proposes its emptying and drying unit which can be installed in line, but requires its own service manipulator,